Project Description
GEMCO have completed installation of a MOT Bay on site at BT Boston.
All civil works, electrical works, installation and floor painting has been completed by our team at GEMCO.
Equipment fitted includes; click on equipment for more information.
SHERPA BPSATL7 Class 7 Roller Brake Tester with tablet
Sherpa Hydraulic Play Detector
Heavy duty steering turntables
GEMJB28M 2.8 tonne Jacking Beam
LITECHECK6DLG Headlight Tester with 3 meter rails
Complete MOT Kit
For further information on any of the equipment fitted please call GEMCO on 01604 828 600.